Torbay Court Hotel

SHARE THIS POST

Torbay Court Hotel

Scafftec were called in at last minute due to the client being let down.

We erect a scaffold to 3 sides of the building to allow render work to be carried out.

The work was being carried out over the winter months so the scaffold needed to be fully shrink wrapped.