Guildhall Plymouth

SHARE THIS POST

Guildhall Plymouth

Here is a picture from a recent drone flight that shows the extent of the work carried out on 2 elevations.
The scaffold to the rear of the building is around the South West turret with the front being on the North elevation.
Both scaffolds were built to a specific design.
Due to the building being grade 1 listed, the scaffold could not be drilled to the wall. The North elevation is held in place by a buttress with the South West turret locking itself together.
Both scaffolds were erected by our highly skilled teams.

#plymouth #guildhall #scaffolding #workingoutside #citycentre #oceancity #council #riggers #construction #historicbuildings #westcountrystonemasons

{CAPTION}
{CAPTION}