We were called in to assess the best way to provide access to three sides of the north pier wall, at the Waterfront pub.
After discussions with our designer, we came up with this scaffold solution. The structure had to be erected around the tides to allow safe access to the base of the wall at low tide, enabling essential emergency maintenance to be carried out.
The team did a cracking job getting this up safely and on time. 👏 #scaffolding #plymouth #devon #riggers #heritage