Scafftec needed to supply and erect a scaffold temporary roof over the building to allow the lead valley on the church to be replaced. It was important that this was done in the dry as the inside of the church would be destroyed if water had got in.
Scafftec erected a full height scaffold to the building to allow full roof replacement to take place. This scaffold could only be erected over the weekend, when there was no children in the school.